  Job Title:            
    Senior Project Controls Specialist  
                   
  Contact Name / Company:        
    System One Services  
                   
  Contact e-mail:            
    damon.burnette@systemoneservices.com  
                   
  Contact Phone:            
    412-374-5761  
                   
  Industry:            
    Nuclear  
                   
  Location:            
    Peach Bottom Power Station  
                   
  Salary:            
    Hourly Rate Per Diem  
                   
  Job Description:            
    Scope of Work:
Currently seeking one (1) Senior Project Controls Specialists.

This position will be located at Peach Bottom Power Station. The individual will provide project scheduling, cost and EVM support on three active installation projects. The position will begin will pre-outage schedule development and support. It will transition into outage support and end with post-outage close-out. OT will be limited to less than 10 hours per week during pre-outage and post-outage work, and will be up to 32 hours per week during the outage.

The following skills are required:
1. Very skilled in Primavera including resource loading.
2. Very skilled in critical path schedule management
3. Thorough understanding of Earned Value Management concepts
4. Ability to create and maintain detailed and summary-level project schedules.
5. Ability to track and forecast project costs .
6. Very skilled in Microsoft Excel including complex chart development
7. Ability to gain unescorted access to US nuclear power plants.

Standard Requirements/Responsibilities:
1. Drive development and maintenance of specific project cost control baseline, Work Breakdown Structure (WBS), and Earned Value Management System (EVMS) reporting systems to fulfill
project requirements.
2. Interface with Project team and others to enable exchange of information necessary to perform quality schedule, risk, budget and cost management.
3. Implement the project estimate into SAP as the project budget.
4. Implement all data into PRISM for project cost functions.
5. Establish initial cost baseline, WBS, and EVMS basis/analysis systems.
6. Drive monthly EVMS reporting system to include monthly variance reporting by the responsible managers.
7. Provide overall budget and cost change control.
8. Present all reports and analyses related to the Project costs and/or schedule and risks.
9. Identify project risks and develop & drive the mitigation strategy.

Requirements
1. Bachelor?s degree in Engineering, Business, Construction Management, or equivalent technical discipline or recognized equivalent.
2. Minimum of 8; typically 12 plus years of project cost and schedule control.
3. Proficiency in Primavera scheduling products, SAP and ARES PRISM is desired.
4. MBA and Project Management certification are highly desired.

***Must have nuclear experience. Must have worked at a nuclear power plant in the past year and have unescorted access to nuclear sites****
                   
       
           
   